SYD01 Campus
In planning
The site
- Operator
- Stack Infrastructure
- Address
- 78 Lockwood Road, Erskine Park
- Lot and DP
- Lot 101 DP1268632
- Site area
- 7.7 ha
- IT load
- 72 MW
- Note
- Amended scheme exhibited 20 April to 4 May 2026. The planning application states 450 MW of operational capacity; the 360 MW on Stack's website is likely IT load.
Planning
STACK SYD01 Data Centre, Erskine Park
More Information Required
- SEARs
- Prepare EIS
- Exhibition
- Collate Submissions
- Response to Submissions
- Assessment
- Recommendation
- Determination
Construction and operation of a data centre with an operational capacity of 450 MW including a building height of 24 m, 82,020 sqm of GFA, substation, water storage, ancillary infrastructure and landscaping.
141 documents · 14 submissions
What's nearby
Closest substations
| Mamre | 330 kV | 1.5 km |
|---|---|---|
| Sydney West | 330 kV | 1.6 km |
| South Erskine Park | 132 kV | 1.8 km |
| Erskine Park | 132 kV | 1.8 km |
| Eastern Creek | 132 kV | 2.4 km |
Closest lines
- 330 kV or higher line 384 m
- 132 kV line 377 m
Other data centres within 5 km
9 other data centres within 5 km. Sign up free to see which.
Straight-line distances from the site. Connection routes and capacity depend on the network operator.
Grid detail
The full map has the grid detail
Spare capacity, connection queues, planned upgrades, zoning and lots, for any site in NSW. No scores, just the facts to make your own call.
Checked 31 October 2026. Planning stage from the NSW Planning Portal, 2 November 2026. MW is announced campus capacity, not power drawn today.
See every site like this
Free for your email address. Every other NSW site, the whole planning list and the live map open up.