NSW tracker

S7 Sydney

NextDC · Honeycomb Drive, Eastern Creek

In planning

612MWAnnounced capacity
400MWIT load

Open on the map

The site

Operator
NextDC
Address
Honeycomb Drive, Eastern Creek
IT load
400 MW
Note
The planning application states 612 MW of operational capacity. 650 MW was the December 2025 headline.

Planning

NEXTDC S7 Data Centre, Eastern Creek

SSD-113934740

Prepare EIS

  1. SEARs
  2. Prepare EIS
  3. Exhibition
  4. Collate Submissions
  5. Response to Submissions
  6. Assessment
  7. Recommendation
  8. Determination

Construction and operation of a data centre with an operational capacity of 612 MW comprising of three, two-storey data storage buildings including 340 back-up diesel generators, diesel fuel storage, on-site substation, site works and car parking.

27 documents

What's nearby

HuntingwoodNorth Eastern CreekEastern CreekSydney West1 km
Grid: Geoscience Australia, CC BY 4.0. Square marks are substations.

Location approximate. We have not confirmed this site's boundary.

Closest substations

Sydney West330 kV3.4 km
Mamre330 kV5.8 km
Huntingwood132 kV1.4 km
North Eastern Creek132 kV1.6 km
Eastern Creek North132 kV1.6 km

Closest lines

  • 330 kV or higher line 3.1 km
  • 132 kV line 1.4 km

Other data centres within 5 km

13 other data centres within 5 km. Sign up free to see which.

Straight-line distances from the site. Connection routes and capacity depend on the network operator.

Grid detail

The full map has the grid detail

Spare capacity, connection queues, planned upgrades, zoning and lots, for any site in NSW. No scores, just the facts to make your own call.

See what's in the full map

Checked 31 October 2026. Planning stage from the NSW Planning Portal, 2 November 2026. MW is announced campus capacity, not power drawn today.