Project Atlas
In planning
The site
- Operator
- Goodman
- Address
- 10 Roberts Road, Eastern Creek
- Lot and DP
- Lot 553 DP1110447
- Site area
- 16.9 ha
- IT load
- 330 MW
- Timing
- Completion expected 2029
- Note
- The filing states 500 MVA.
Planning
Project Atlas Data Centre Eastern Creek
More Information Required
- SEARs
- Prepare EIS
- Exhibition
- Collate Submissions
- Response to Submissions
- Assessment
- Recommendation
- Determination
Demolition of existing buildings and construction/operation of a 500MVA data centre at 10 Roberts Road, including offsite enabling infrastructure
134 documents · 21 submissions
What's nearby
Closest substations
| Sydney West | 330 kV | 712 m |
|---|---|---|
| Mamre | 330 kV | 3.7 km |
| Eastern Creek | 132 kV | 591 m |
| Eastern Creek North | 132 kV | 1.8 km |
| North Eastern Creek | 132 kV | 1.8 km |
Closest lines
- 330 kV or higher line 712 m
- 132 kV line 11 m
Other data centres within 5 km
15 other data centres within 5 km. Sign up free to see which.
Straight-line distances from the site. Connection routes and capacity depend on the network operator.
Grid detail
The full map has the grid detail
Spare capacity, connection queues, planned upgrades, zoning and lots, for any site in NSW. No scores, just the facts to make your own call.
Checked 31 October 2026. Planning stage from the NSW Planning Portal, 2 November 2026. MW is announced campus capacity, not power drawn today.
See every site like this
Free for your email address. Every other NSW site, the whole planning list and the live map open up.