SYD4
In planning
The site
- Operator
- AirTrunk
- Address
- 706-752 Mamre Road, Kemps Creek
- Lot and DP
- Lot 10 DP1280592
- Site area
- 52.0 ha
- IT load
- 650 MW
- Note
- The portal states 1 GW and the applicant's documents state 1.2 GW; we use the portal figure. The scheme was amended from six buildings to three.
Planning
Mamre Road Data Centre Campus
Assessment
- SEARs
- Prepare EIS
- Exhibition
- Collate Submissions
- Response to Submissions
- Assessment
- Recommendation
- Determination
Construction and operation of a data centre campus with a power capacity of 1 GW including six four-storey data centre buildings, 936 cooling units, 852 diesel back-up generators and 14,430 kl of diesel storage, internal roads and car parking.
182 documents · 79 submissions
What's nearby
Closest substations
| Mamre | 330 kV | 2.6 km |
|---|---|---|
| Sydney West | 330 kV | 4.3 km |
| Erskine Park | 132 kV | 1.5 km |
| South Erskine Park | 132 kV | 1.5 km |
| Badgerys Creek | 132 kV | 4.6 km |
Closest lines
- 330 kV or higher line 1.6 km
- 132 kV line 2.5 km
Other data centres within 5 km
6 other data centres within 5 km. Sign up free to see which.
Straight-line distances from the site. Connection routes and capacity depend on the network operator.
Grid detail
The full map has the grid detail
Spare capacity, connection queues, planned upgrades, zoning and lots, for any site in NSW. No scores, just the facts to make your own call.
Checked 31 October 2026. Planning stage from the NSW Planning Portal, 2 November 2026. MW is announced campus capacity, not power drawn today.
See every site like this
Free for your email address. Every other NSW site, the whole planning list and the live map open up.